| Project | Project to build the elevated road along Ring Road 2, Vĩnh Tuy Bridge – Ngã Tư Sở section, under a BT (build–transfer) contract. |
| Investor | Vingroup Joint Stock Company. |
| Project management consultant | Project Management Unit 2. |
| Design consultant | Công ty Cổ phần Tư vấn Đường cao tốc Việt Nam (VECC). |
| Supervision consultant | Công ty Tư vấn công trình Châu Á Thái Bình Dương (APECO). |
| Contractor | Joint venture of Công ty cổ phần lắp máy và xây dựng Trung Nam EC and Công ty TNHH Thương mại và Xây dựng Trung Chính. |
Technology: The project uses a new technology, applied for the first time in Vietnam: prestressed reinforced concrete box girders with flanges widened by inclined steel struts.
Testing scope: Checking the construction technology for prestressed reinforced concrete box girders with flanges widened by inclined steel struts; checking the requirements for concrete mix design and girder concrete grade, and checking that construction follows the specified dimensions and technical parameters.