The retained-coursework-mark class Design and Construction of Reinforced Concrete Bridges 1 (120415) - DQT will sit the exam with class 60CD6.
Time: starting at period 4, 8/6/2018
Venue: 26H2
Original post on the former website (Vietnamese): bomoncau.huce.edu.vn