The Bridge and Tunnel Engineering Group, Faculty of Bridges and Roads – Hanoi University of Civil Engineering, announces the plan for the AUN-QA progress review of engineer-programme graduation (capstone) projects (review 1, round 2, 2025–2026 academic year) for students of Transport Construction Engineering, Bridge and Tunnel Engineering specialisation.
Time: 14:00, Thursday, 02/7/2026
Format: In person
Venue:
- Panel 1: Room 52, Lecture Building H3
- Panel 2: Room 53, Lecture Building H3
Under the plan, the Group has established 02 panels to assess progress on the projects, the extent to which they meet AUN-QA requirements and the direction for completing the projects in the next stage.
The Group requests that:
- Students on the list attend at the specified time and venue.
- Students fully prepare their reports, documents and other items required by the panel.
- Supervisors coordinate with, monitor and support their students during the review.
The student list and panel assignments are attached to Notice No. 03-26/TB-NCMC, attached to this announcement
Original post on the former website (Vietnamese): bomoncau.huce.edu.vn